Grid / DNO & smart energy

Resolve the grid route before the equipment list becomes fixed.

Solar, batteries and EV charging all interact with the grid. Connection requirements, export limits and control strategy should be considered early in the design.

Grid and DNO infrastructure visual

REMOVE GRID UNCERTAINTY EARLY

Find the connection route before the equipment list becomes expensive to change.

The grid conversation should begin with the whole site: existing supply, aggregate generation, storage, export behaviour and future electrical demand.

01Existing connection

Supply characteristics, existing generation and known network constraints form the baseline for the connection strategy.

02Aggregate equipment

Solar and battery inverters should be considered together where applicable rather than treated as isolated products.

03Import / export behaviour

Proposed export, limitation schemes and future EV or building loads can affect the notification or application route.

CLIENT BENEFITFewer late-stage redesigns caused by a connection condition discovered too late.

GRID / DNO ROUTE

Connection strategy should be resolved early.

Generation, batteries and EV load can alter the connection route. The design should identify the notification/application pathway before equipment is treated as final.

Existing supplyImport capacity and network connection.
GenerationPV and battery inverter AC output.
RouteG98 or G99 as applicable.
ExportG100 limitation where used.
CommissionProtection, settings, evidence and DNO records.
G98For compliant smaller generation within the applicable per-phase threshold.
G99Applies where generation exceeds the G98 route.
G100Covers customer export limitation schemes.
Combined systemsSolar and battery outputs must be considered together where applicable.

Technical reference: Energy Networks Association engineering recommendations G98, G99 and G100. The applicable route must be checked for the specific installation and DNO.

CONNECTION INPUTS

Resolve the connection route from the whole site, not one device.

The network conversation can depend on the aggregate generating equipment, existing supply, proposed export behaviour and how solar, storage or EV infrastructure interact.

Existing connectionSupply characteristics, existing generation and any known network constraints or agreements.
Generating equipmentAggregate inverter or generation arrangement rather than considering each product in isolation.
Import / exportExpected site behaviour and whether an agreed export limitation or control scheme forms part of the design.
Future changesBattery additions, EV charging, heat pumps or expansion that may change the connection strategy later.

G98, G99 and G100 are explained in the connection routes guide. The applicable route should be confirmed for the actual project rather than inferred from a generic website threshold.

COMMON QUESTIONS

Questions worth answering before the equipment is fixed.

Q01

What are G98 and G99 used for?

They are engineering recommendation routes used for connecting generating equipment to distribution networks. The correct route depends on the actual equipment and aggregate installation.

Q02

What is G100?

G100 covers customer export and import limitation schemes where limiting site behaviour forms part of the agreed network connection strategy.

Q03

Why deal with DNO requirements early?

Because an export limit, application requirement or connection condition can change inverter selection, controls, commissioning and the commercial model. It is cheaper to design around the route than retrofit the route later.

GRID CONTEXT

Grid connections and controls are part of the electrical design.

Grid and electrical infrastructure visual
Grid connection and export requirements shape the design.
Grid and DNO infrastructure visual
DNO assessment considers supply capacity, network conditions and controls.
GRID & CONNECTION

Resolve the network and control requirements early.

The applicable connection process depends on the equipment, existing supply and network conditions at the actual site.

Initial checks

Understand the connection

Review the existing electrical supply, proposed generation or storage capacity and whether export is intended.

DNO route

Notification or application?

Determine the relevant G98 or G99 process and any network conditions before the design is finalised.

Export controls

When G100 matters

Where an export limit applies, design, commission and document the relevant export-limitation controls and monitoring.