Compare the project economics with the assumptions visible.
Commercial decisions are easier when capex, finance structure, tariff assumptions, self-consumption and export value are separated clearly rather than hidden behind a headline payback figure.
KEEP THE NUMBERS TRACEABLE
A financial model is only useful when the engineering assumptions underneath it are visible.
Separate the physical system, energy assumptions and funding structure so the client can see which variables are driving the commercial result.
01Engineering inputs
System size, generation estimate, self-consumption, operating limits and expected degradation belong in the technical layer.
02Energy-value assumptions
Import cost, export value and tariff behaviour can move the result. These should be stated rather than hidden inside a headline payback figure.
03Funding structure
Cash purchase, lending or other arrangements change cashflow and total cost. Provider terms should be assessed separately from the engineering case.

FINANCIAL MODEL
ROI should be reproducible from the assumptions.
The commercial model should allow a decision-maker to see which inputs drive the result and what happens if those inputs change.
PAYBACK INPUTS
A commercial model should be auditable.
Instead of presenting one payback number in isolation, the proposal should show the inputs that create it and separate measured site data from assumptions.
Related guidance: Commercial solar ROI · Smart Export Guarantee.
Start with the site, not a sales script.
Business survey or homeowner quote — routed to the right questions from the first click.
PROJECT ECONOMICS
The engineering design shapes the financial case.


Understand what changes the financial case.
Any useful payback estimate starts with site demand, a defined scope and assumptions you can inspect.
Import savings and export income
Generation that your site uses directly and generation exported to the grid have different values. The model should distinguish them.
Compare like with like
Check the equipment, access, electrical work, permissions, commissioning and any ongoing service costs included in each proposal.
Review the complete terms
Compare total repayments, eligibility, rates and any ownership conditions before making a finance decision. No terms should be assumed without a provider quote.
CONNECTED ENERGY SYSTEM
Move between the parts of the system without starting over.
Solar generation, storage, EV charging and grid constraints affect each other. Use these routes to keep the project connected.
PROJECT ECONOMICS
Build the model around your site data.
A useful commercial model starts with demand, tariff and generation assumptions that can be challenged before the investment decision is made.